Stair Parts I350D-000-HD58D Installation Guide

Browse online or download Installation Guide for Unknown Stair Parts I350D-000-HD58D. Stair Parts I350D-000-HD58D Installation Guide User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 13
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
© 2013 SureWood-LNL All Right Reserved | p 1
How to build a
staircase like a pro.
Identify Your Type of Post-to-Post Staircase:
1
Post-To-Post
Staircase
System
Determine the
parts needed.
Legend
A - Starting Newel
B - Landing Newel
C - Rosette
D - Half Newel
Straight
“U” - Shaped
“L” - Shaped
Closed Staircase with Square
Top Balusters and Kneewall
Open Staircase with
Pin Top Balusters
Open Staircase with
Square Top Balusters
and Shoe rail
Landing Newel Post
Starting
Newel Post
Square Top
Balusters
Shoe rail
Wall Rail
Level Run
Handrail
Rosette
Pin Top
Balusters
Rake
Handrail
Kneewall
SOM300113
Effective 11/20/2006
SURE
WOOD
~
LNL
Page view 0
1 2 3 4 5 6 ... 12 13

Summary of Contents

Page 1 - How to build a

© 2013 SureWood-LNL All Right Reserved | p 1How to build a staircase like a pro.Identify Your Type of Post-to-Post Staircase: 1Post-To-PostStaircase

Page 2 - (Oak, Poplar, Hemlock)

© 2013 SureWood-LNL All Right Reserved | p 10Over-the-PostMark Position of Landing Newel and Center-lineBaluster Center-lineFace of StringerMark Pos

Page 3

© 2013 SureWood-LNL All Right Reserved | p 114 Using newels as guides, mark handrail and cut to proper length. Follow instructions for attaching new

Page 4

© 2013 SureWood-LNL All Right Reserved | p 12Two Methods for Removing Old Balusters:1. A firm twist of the baluster may be all that is necessary to

Page 5

© 2013 SureWood-LNL All Right Reserved | p 13Flat ShoeRakeShoe RakeBefore placing the balusters in the staircase, top and bottom “shoes” must be ins

Page 6

© 2013 SureWood-LNL All Right Reserved | p 2Post-to-Post Staircase Parts Checklist:3Check local building codes to ensure compliance.All stair parts

Page 7

© 2013 SureWood-LNL All Right Reserved | p 3Tools Required:4Basic Layout and Newel Post Installation:6Operation: Tools Needed:Measuring and Leveling

Page 8

© 2013 SureWood-LNL All Right Reserved | p 4Attaching Handrail for Pin Top Balusters:7aAttaching Handrail for Square Top Balusters:7bPin topare inst

Page 9 - IRON BALUSTER

© 2013 SureWood-LNL All Right Reserved | p 5How to build a staircase like a pro.Identify Your Type of Over-The-Post Staircase: 1Over-The-PostStairca

Page 10 - 36” to 41”

© 2013 SureWood-LNL All Right Reserved | p 6Post-to-Post Staircase Parts Checklist:3Check local building codes to ensure compliance.All stair parts

Page 11 - Choose your look

© 2013 SureWood-LNL All Right Reserved | p 7Tools Required:4Basic Installation:6Operation: Tools Needed:Measuring and LevelingCuttingNailingGluingSc

Page 12 - Trim Iron Balusters to fit

© 2013 SureWood-LNL All Right Reserved | p 8Assemble the Handrail:7Installing the Balusters and Handrail: 9Finish to Wall and Wall Rail Installation

Page 13 - Install and Secure Balusters

© 2013 SureWood-LNL All Right Reserved | p 9A “How-To” Guide for the Installation of Iron Balusters.IRON BALUSTERINSTALLATION GUIDESUREWOOD~LNLPost-

Comments to this Manuals

No comments